On July 23rd, the teams of the Port of Metz loaded 4 locomotives on board the OTRATE ship. The locomotives travelled 952 km by river before reaching Magdeburg to be transported to their final destination. A great operation carried out jointly by the CFNR agencies of Metz and Uckange and Rhenus Berlin